30 0055_30 0054_572021_011402.mp4
2 ft. - General Observation - MAG COAT 99% START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
10 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
10.2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - SLUDGE ROCKS PAPER
115.2 ft. - General Observation - GREASE ON MAG COAT
123 ft. - Surface Aggregate Missing, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG
216.5 ft. - Surface Aggregate Missing, from 01 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
260.9 ft. - Surface Aggregate Missing, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG
309.4 ft. - Surface Aggregate Missing, from 12 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG
316 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
317.2 ft. - Surface Reinforcement Corroded, from 01 to 03 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
507.1 ft. - Surface Reinforcement Corroded, from 09 to 11 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 260.9 | SAM | SEVERE AGG |
| 145 | DSZ | SLUDGE ROCKS PAPER |
| 309.4 | SAM | SEVERE AGG |
| 123 | SAM | SEVERE AGG |
| 310.3 | DSZ | PEELED CONCRET FROM PIPE |
| 0 | MWM | — |
| 522.1 | SAM | SEVERE AGG |
| 522.1 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 454.4 | DSZ | ROCKS PEELED CONCRETE |
| 522.1 | MGO | 95% MAQG COAT FINISH |
| 351.9 | DSZ | SLUDGE ROCKS |
| 316 | SRC | CIRCUM REBAR |
| 18.5 | MGO | MAG COAT 95% |
| 2 | MGO | MAG COAT 99% START |
| 10 | MGO | MAG COAT 70% |
| 10 | SAM | SEVERE AGG |
| 522.1 | DSZ | SLUDGE |
| 522.1 | DSZ | SLUDGE |
| 522.8 | AMH | 2:50AM |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 507.1 | SRC | CIRCUM REBAR |
| 216.5 | SAM | SEVERE AGG |
| 317.2 | SRC | CIRCUM REBAR |
| 0 | MWL | — |
| 0 | AMH | 1:10AM |
| 10.2 | DSZ | SLUDGE ROCKS PAPER |
| 522.1 | SSS | BLISTERING PEELING CONCRETE |
| 115.2 | MGO | GREASE ON MAG COAT |
| 330.7 | DSZ | PEELED CONCRETE FROM PIPE |