Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 29, 2021, 09:46 AM
  • 02 0615_02 0671_03292021_025243.mp4

Date
03/29/2021
W/O
886194
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00258
PipeID
P03163
Time
2:46 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8706
Sewer Name
02 EAST COMPTON BOULEVARD EXTENSION TRUNK
City
DOWNEY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
33
Purpose
Routine Assessment
Project
RFIR_WO_886194_TV02384_APR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
18 in.
Upstream MH
02 0615
Downstream MH
02 0671
Dir. of Survey
Downstream
Length Surveyed
142 ft.
Total Length
142 ft.
Structural Index
3
Structural Quick
413E
Structural Rating
144
O&M Index
2
O&M Quick
2E00
O&M Rating
56
Overall Index
2
Overall Quick
Overall Rating
200
Pipe schematic from manhole 02 0615 to 02 0671
MH: 02 0615MH: 02 0671downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 06152 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start15.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN18.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN69.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN71.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN125.8 ft. FM - Fracture Multiple, from 09 to 05 o'clock, within 8 inches of joint: YES140 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish140 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish142 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish142 ft. AMH - Downstream Manhole, Survey Ends - 02 0671142 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 09 to 05 o'clock, within 8 inches of joint: YES

    125.8 ft. - Fracture Multiple, from 09 to 05 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
0MWM
142CM
142AMH02 0671
140DAGS
18.6TFOPEN
15.5TFOPEN
142MGOCONN @ MH 9 O'CLOCK/
125.8FM
140SSS
2CM
0MWL
2SSS
69.5TFOPEN
0AMH02 0615
71.8TFOPEN
2DAGS

Properties (7)

additional_info
630074032921001
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-03-29T02:46:45-07:00
documentation
PROPIPE
is_lateral_inspection
false