Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 29, 2021, 10:48 AM
  • 02 0611_02 0610_03292021_035955.mp4

Date
03/29/2021
W/O
886194
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00258
PipeID
P03158
Time
3:48 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8706
Sewer Name
02 EAST COMPTON BOULEVARD EXTENSION TRUNK
City
DOWNEY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
33
Purpose
Routine Assessment
Project
RFIR_WO_886194_TV02384_APR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
18 in.
Upstream MH
02 0611
Downstream MH
02 0610
Dir. of Survey
Downstream
Length Surveyed
328.9 ft.
Total Length
328.9 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
325
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
2
Overall Quick
Overall Rating
455
Pipe schematic from manhole 02 0611 to 02 0610
MH: 02 0611MH: 02 0610downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 06110 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start40.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN96 ft. MGO - General Observation - (1) RAT @ MH140 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN213.2 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN213.5 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN243.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"308.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN326 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish326 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish328.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish328.9 ft. AMH - Downstream Manhole, Survey Ends - 02 0610

Observation photos (4)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    213.2 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    213.5 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    308.8 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

Observations (17)

DistanceCodeObservation
0AMH02 0611
308.8TBOPEN
0MWL
326SSS
140TFOPEN
213.2TBOPEN
326DAGS
243.1TFA
328.9CM
96MGO(1) RAT @ MH
2CM
2SSS
328.9AMH02 0610
2DAGS
213.5TBOPEN
40.2TFOPEN
0MWM

Properties (7)

additional_info
630074032921001
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-03-29T03:48:24-07:00
documentation
PROPIPE
is_lateral_inspection
false