Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 29, 2021, 11:15 AM
  • 02 0609_02 0608_03292021_042447.mp4

Date
03/29/2021
W/O
886194
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00258
PipeID
P03155
Time
4:15 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8706
Sewer Name
02 EAST COMPTON BOULEVARD EXTENSION TRUNK
City
DOWNEY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
33
Purpose
Routine Assessment
Project
RFIR_WO_886194_TV02384_APR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
18 in.
Upstream MH
02 0609
Downstream MH
02 0608
Dir. of Survey
Downstream
Length Surveyed
325.5 ft.
Total Length
325.5 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
323
O&M Index
2
O&M Quick
2L00
O&M Rating
128
Overall Index
2
Overall Quick
Overall Rating
451
Pipe schematic from manhole 02 0609 to 02 0608
MH: 02 0609MH: 02 0608downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 06092 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start30.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN130.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"234.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN323 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish323 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish325.5 ft. AMH - Downstream Manhole, Survey Ends - 02 0608325.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0MWL
0MGOCONN @ MH 3 O'CLOCK/UNKNOWN
323SSS
2CM
2DAGS
130.4TFC
2SSS
0MWM
323DAGS
325.5AMH02 0608
30.3TFOPEN
325.5CM
234.1TFOPEN
0AMH02 0609

Properties (7)

additional_info
630074032921001
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-03-29T04:15:03-07:00
documentation
PROPIPE
is_lateral_inspection
false