Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 29, 2021, 10:10 AM
  • 02 0605_02 0604_03292021_032129.mp4

Date
03/29/2021
W/O
886194
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00258
PipeID
P03151
Time
3:10 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8706
Sewer Name
02 EAST COMPTON BOULEVARD EXTENSION TRUNK
City
DOWNEY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
33
Purpose
Routine Assessment
Project
RFIR_WO_886194_TV02384_APR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
21 in.
Upstream MH
02 0605
Downstream MH
02 0604
Dir. of Survey
Downstream
Length Surveyed
249.8 ft.
Total Length
249.8 ft.
Structural Index
2
Structural Quick
322I
Structural Rating
104
O&M Index
2
O&M Quick
2I00
O&M Rating
98
Overall Index
2
Overall Quick
Overall Rating
202
Pipe schematic from manhole 02 0605 to 02 0604
MH: 02 0605MH: 02 0604downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 06052 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start43.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6" - OPEN148.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"181.6 ft. MGO - General Observation - (1) RAT @ MH181.6 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN247 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish247 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish249.8 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED249.8 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/CAPPED249.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish249.8 ft. AMH - Downstream Manhole, Survey Ends - 02 0604

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    181.6 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

Observations (16)

DistanceCodeObservation
249.8MGOCONN @ MH 3 O'CLOCK/CAPPED
0MWL
181.6MGO(1) RAT @ MH
43.7TFOPEN
249.8MGOCONN @ MH 9 O'CLOCK/CAPPED
2DAGS
0MWM
249.8CM
247DAGS
0AMH02 0605
247SSS
2SSS
249.8AMH02 0604
148.4TFC
2CM
181.6TBOPEN

Properties (7)

additional_info
630074032921001
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-03-29T03:10:17-07:00
documentation
PROPIPE
is_lateral_inspection
false