D 0186_D 0144_12072015_Manual.mp4
2 ft. - General Observation - MISSING TILES 100% START 9:00 TO 3:00
2 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - CIRCUM
2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
22.1 ft. - General Observation - MISSING TILES 30%
23.8 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES - CIRCUM & LONG
46.6 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES - CIRCUM & LONG
58.9 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES - CIRCUM REBAR MISSING BROKEN
69.1 ft. - General Observation - MH CONN BULKHEAD 9:00
| Distance | Code | Observation |
|---|---|---|
| 69.1 | SAM | SEVERE |
| 69.1 | SRC | CIRCUM |
| 69.1 | MGO | MISSING TILES 100% FINISH |
| 58.9 | SRC | CIRCUM REBAR MISSING BROKEN |
| 2 | MGO | MISSING TILES 100% START 9:00 TO 3:00 |
| 2 | SRC | LONG |
| 69.1 | SRC | LONG |
| 2 | SRC | CIRCUM |
| 69.4 | AMH | 2:10AM |
| 2 | SAM | SEVERE AGG |
| 0 | MWM | — |
| 22.1 | MGO | MISSING TILES 30% |
| 46.6 | SRC | CIRCUM & LONG |
| 69.1 | MGO | MH CONN BULKHEAD 9:00 |
| 0 | AMH | 1:50AM |
| 0 | MWL | — |
| 23.8 | SRC | CIRCUM & LONG |