- Date
- 11/16/2015
- W/O
- 0531040
- Weather
- Dry
- Operator/Surveyor
- IGNACIO
- Sewer ID
- Z00659
- PipeID
- P13611
- Time
- 9:27 AM
- Certificate
- U-115-06022628
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- G6640
- Sewer Name
- 16 LAMANDA PARK TRUNK
- City
- PASADENA
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 16
- Page No.
- 15
- Purpose
- Routine Assessment
- Project
- 20151116MI_LAMANDA_PARK_TRUNK
- Material
- Reinforced Concrete Pipe
- Shape
- Circular
- Height
- 22 in.
- Upstream MH
- 16 0559
- Downstream MH
- 16 0560
- Dir. of Survey
- Upstream
- Length Surveyed
- 46.5 ft.
- Total Length
- 46.5 ft.
- Structural Index
- 0
- Structural Quick
- 0000
- Structural Rating
- 0
- O&M Index
- 0
- O&M Quick
- 0000
- O&M Rating
- 0
- Overall Index
- 0
- Overall Quick
- —
- Overall Rating
- 0
Pipe schematic from manhole 16 0559 to 16 0560 Observation photos (3)

9.3 ft. - General Observation - MAGNESIUM HYDROXIDE COATING, 8 TO 4 OCLOCK, 90%, START

43.2 ft. - General Observation - MAGNESIUM HYDROXIDE COATING, 8 TO 4 OCLOCK, 90%, END

46.5 ft. - Upstream Manhole, Survey Ends - 10:52AM