02 0123_02 0122_11172015_Manual.mp4
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES
2 ft. - General Observation - MAG COAT 30% START
2 ft. - General Observation - MISSING TILES 50% START 8:00 TO 4:00
2.6 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - LONG CIRCUM
3.2 ft. - General Observation - 10% MISSING TILES
6.6 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM
12.5 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish
26.4 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM
30.1 ft. - General Photograph - NEW LINER DOWNSTREAM
| Distance | Code | Observation |
|---|---|---|
| 0 | MGO | MH CONN STUB 3:00 |
| 30.1 | MGO | MISSING TILES 50%FINISH |
| 30.1 | MGP | NEW LINER DOWNSTREAM |
| 2 | SAV | SEVERE AGG AREAS OF MISSING TILES |
| 30.1 | MGO | MAG COAT 30% FINISH |
| 30.6 | AMH | 3:50AM |
| 2 | MGO | MAG COAT 30% START |
| 12.5 | SRV | — |
| 2.6 | SRV | LONG CIRCUM |
| 2 | MGO | MISSING TILES 50% START 8:00 TO 4:00 |
| 3.2 | MGO | 10% MISSING TILES |
| 0 | MGO | MH CONN STUB 9:00 |
| 30.1 | SAV | SEVERE AGG AREAS OF MISSING TILES |
| 0 | AMH | 3:40AM |
| 26.4 | SRV | CIRCUM |
| 6.6 | SRV | LONG CIRCUM |