02 0126_02 0125_11172015_Manual.mp4
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - AREAS OF MISSING TILES
2 ft. - General Observation - MISSING TILES 40% 8:00 TO 4:00 START
2 ft. - General Observation - MAG COAT 30% START
12 ft. - General Observation - MISSING TILES 20%
45.6 ft. - General Photograph
108.3 ft. - General Photograph
122 ft. - General Photograph
192 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - LONG & CIRCUM REBAR
240.6 ft. - General Photograph
273.9 ft. - Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
292.9 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM
| Distance | Code | Observation |
|---|---|---|
| 2 | SAV | AREAS OF MISSING TILES |
| 192 | SRV | LONG & CIRCUM REBAR |
| 273.9 | SRV | CIRCUM REBAR |
| 305.2 | MGO | MISSING TILES 40% FINISH |
| 0 | MWL | — |
| 305.5 | AMH | 2:30AM |
| 0 | MWM | — |
| 122 | MGP | — |
| 45.6 | MGP | — |
| 108.3 | MGP | — |
| 0 | AMH | 2:00AM |
| 12 | MGO | MISSING TILES 20% |
| 2 | MGO | MISSING TILES 40% 8:00 TO 4:00 START |
| 305.2 | SAV | SEVERE AGG AREAS OF MISSING TILES |
| 240.6 | MGP | — |
| 2 | MGO | MAG COAT 30% START |
| 305.2 | MGO | MAG COAT 30% FINISH |
| 292.9 | SRV | CIRCUM |