Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 12, 2015, 12:05 PM
  • 02 0139A_02 0139_11122015_Manual.mp4

Date
11/12/2015
W/O
0536410
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00251
PipeID
P02442
Time
4:05 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6633
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
BELLFLOWER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
38
Purpose
Routine Assessment
Project
20151112MDM_DOWNEY_BELLFLOWER_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
27 in.
Upstream MH
02 0139A
Downstream MH
02 0139
Dir. of Survey
Downstream
Length Surveyed
334.7 ft.
Total Length
334.7 ft.
Structural Index
3
Structural Quick
3323
Structural Rating
15
O&M Index
2
O&M Quick
2B00
O&M Rating
30
Overall Index
2
Overall Quick
Overall Rating
45
Pipe schematic from manhole 02 0139A to 02 0139
MH: 02 0139AMH: 02 0139downstream0 ft. AMH - Upstream Manhole, Survey Begins - 4:15AM0 ft. MGO - General Observation - STUB MH CONN 3:000 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MGO - General Observation - STUB MH CONN 9:000 ft. MWL - Water Level, 5 %of cross sectional area - STANDING WATER NO FLOW3 ft. FC - Fracture Circumferential, from 11 to 12 o'clock, within 8 inches of joint: YES - HAIRLINE3 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES - HAIRLINE-JOINT TO JOINT9.2 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - SLUDGE- NO FLOW66.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6", 6" - STUB81.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - STUB81.7 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE100.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE134.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - OPEN152.7 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 6" - OPEN163.4 ft. FL - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES - HAIRLINE163.4 ft. FC - Fracture Circumferential, from 11 to 02 o'clock, within 8 inches of joint: YES - HAIRLINE180.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - OPEN194 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES194 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE206.1 ft. FL - Fracture Longitudinal, at 01 o'clock, within 8 inches of joint: YES - LONG212.3 ft. FC - Fracture Circumferential, from 11 to 01 o'clock, within 8 inches of joint: YES - HAIRLINE223.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - STUB254.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - STUB260.6 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 6" - OPEN260.6 ft. MGP - General Photograph - 18" VCP272.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - STUB279.3 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 6" - OPEN296.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - STUB334.4 ft. MGO - General Observation - MH CONN STUB 9:00334.7 ft. AMH - Downstream Manhole, Survey Ends - 4:45AM

Observation photos (2)

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - SLUDGE- NO FLOW

    9.2 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - SLUDGE- NO FLOW

  • General Photograph - 18" VCP

    260.6 ft. - General Photograph - 18" VCP

Observations (30)

DistanceCodeObservation
0AMH4:15AM
66.4TFCSTUB
334.7AMH4:45AM
260.6TBOPEN
3FCHAIRLINE
163.4FLHAIRLINE
0MGOSTUB MH CONN 3:00
206.1FLLONG
134.4TFOPEN
81.7TFCSTUB
81.7DSZSLUDGE
9.2DSZSLUDGE- NO FLOW
212.3FCHAIRLINE
194DAGS
0MWM
163.4FCHAIRLINE
260.6MGP18" VCP
0MGOSTUB MH CONN 9:00
194TFACTIVE
152.7TBOPEN
223.1TFCSTUB
180.5TFOPEN
272.5TFCSTUB
296.7TFCSTUB
254.6TFCSTUB
334.4MGOMH CONN STUB 9:00
0MWLSTANDING WATER NO FLOW
100.5TFACTIVE
279.3TBOPEN
3FLHAIRLINE-JOINT TO JOINT

Properties (6)

custom_field_three
HAIRLINE FRACTURES-1 SHORT JOINT TO JOINT
custom_field_two
4
customer
LACSD
datetime
2015-11-12T04:05:44-08:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false