Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 12, 2015, 09:28 AM
Date
11/12/2015
W/O
0536163
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00349
PipeID
P08467
Time
1:28 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6632
Sewer Name
02 DISTRICT #2 INTERCEPTOR TRUNK
City
COMMERCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Routine Assessment
Project
20151112MDM_DISTRICT_2_INTERCEPTOR_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Upstream MH
02 1434
Downstream MH
02 2290
Dir. of Survey
Downstream
Length Surveyed
91.7 ft.
Total Length
91.7 ft.
Structural Index
2
Structural Quick
2C00
Structural Rating
40
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
42
Pipe schematic from manhole 02 1434 to 02 2290
MH: 02 1434MH: 02 2290downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MGO - General Observation - MH CONN OPEN 3:00 STOPLOG IN PLACE0 ft. AMH - Upstream Manhole, Survey Begins - 1:35AM2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELING BLISATEWRING8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES20.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO25.3 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - RAGS49.6 ft. MGO - General Observation - MAG COAT 20% START 8:00 TO 4:0091.4 ft. MGO - General Observation - MH CONN 3:00 STOPLOG IN PLACE91.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - LAITANCE COAT PEELING BLISTERING91.4 ft. MGO - General Observation - MAG COAT 20% FINISH91.7 ft. AMH - Downstream Manhole, Survey Ends - 2:15AM

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELING BLISATEWRING

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELING BLISATEWRING

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

    8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO

    20.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO

  • General Observation - MAG COAT 20% START 8:00 TO 4:00

    49.6 ft. - General Observation - MAG COAT 20% START 8:00 TO 4:00

Observations (14)

DistanceCodeObservation
91.4MGOMH CONN 3:00 STOPLOG IN PLACE
91.4SSSLAITANCE COAT PEELING BLISTERING
49.6MGOMAG COAT 20% START 8:00 TO 4:00
91.7AMH2:15AM
25.3DSZRAGS
0MWM
20.1SSS
0MWL
0MGOMH CONN 9:00 ACTIVE
0MGOMH CONN OPEN 3:00 STOPLOG IN PLACE
91.4MGOMAG COAT 20% FINISH
2SSSLAITANCE COAT PEELING BLISATEWRING
0AMH1:35AM
8SSS

Properties (6)

custom_field_three
LAITANCE COAT PEELING BLISTERING
custom_field_two
4
customer
LACSD
datetime
2015-11-12T01:28:25-08:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false