Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 31, 2021, 06:59 AM
  • 01 1149_G 0332_03312021_000957.mp4

Date
03/30/2021
W/O
886342
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00225
PipeID
P02000
Time
11:59 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8711
Sewer Name
01 WILCOX AVENUE TRUNK
City
CUDAHY
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
11
Purpose
Routine Assessment
Project
WO_886342_TV01072_APR2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
15 in.
Upstream MH
01 1149
Downstream MH
G 0332
Dir. of Survey
Downstream
Length Surveyed
205.1 ft.
Total Length
205.1 ft.
Structural Index
3
Structural Quick
513G
Structural Rating
199
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
199
Pipe schematic from manhole 01 1149 to G 0332
MH: 01 1149MH: G 0332downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. AMH - Upstream Manhole, Survey Begins - 01 11490 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area3.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.1 ft. HVV - Hole Void Visible, from 11 to 02 o'clock, within 8 inches of joint: YES20.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start98 ft. MGO - General Observation - Spiral crack205.1 ft. MGO - General Observation - CONNECTION AT THE MH 1 OC'LOCK205.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish205.1 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK205.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish205.1 ft. AMH - Downstream Manhole, Survey Ends - G 0332

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Hole Void Visible, from 11 to 02 o'clock, within 8 inches of joint: YES

    3.1 ft. - Hole Void Visible, from 11 to 02 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    20.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
205.1MGOCONNECTION AT THE MH 1 OC'LOCK
0MGOCONNECTION AT THE MH 9 OC'LOCK
0AMH01 1149
0MWL
205.1SAP
205.1MGOCONNECTION AT THE MH 3 OC'LOCK
98MGOSpiral crack
0MWM
20.7SSS
3.1SAP
205.1SSS
205.1AMHG 0332
3.1HVV

Properties (6)

additional_info
630074033021203
customer
1
datetime
2021-03-30T23:59:41-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
10319