Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 15, 2021, 05:11 AM
  • C 0384_C 0383_04142021_225443.mp4

Date
04/14/2021
W/O
886022
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00142
PipeID
P09848
Time
10:11 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8728
Sewer Name
C JOINT OUTFALL C - UNIT 8D
City
LAKEWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_886022_TV19067_APR2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
18 in.
Upstream MH
C 0384
Downstream MH
C 0383
Dir. of Survey
Downstream
Length Surveyed
272.6 ft.
Total Length
272.6 ft.
Structural Index
3
Structural Quick
5G3J
Structural Rating
465
O&M Index
3
O&M Quick
5121
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
473
Pipe schematic from manhole C 0384 to C 0383
MH: C 0384MH: C 0383downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - C 03842.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.1 ft. IW - Infiltration Weeper, from 08 to 04 o'clock, within 8 inches of joint: YES22.5 ft. IS - Infiltration Stain, from 01 to 04 o'clock, within 8 inches of joint: YES76.4 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start86 ft. IG - Infiltration Gusher, at 09 o'clock, within 8 inches of joint: YES256 ft. LR - Alignment Right, 10 %272.6 ft. AMH - Downstream Manhole, Survey Ends - C 0383272.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish272.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish272.6 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Infiltration Stain, from 01 to 04 o'clock, within 8 inches of joint: YES

    22.5 ft. - Infiltration Stain, from 01 to 04 o'clock, within 8 inches of joint: YES

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    76.4 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Infiltration Gusher, at 09 o'clock, within 8 inches of joint: YES

    86 ft. - Infiltration Gusher, at 09 o'clock, within 8 inches of joint: YES

Observations (14)

DistanceCodeObservation
0MWL
0MWM
76.4SRV
272.6AMHC 0383
2.1SSS
0AMHC 0384
256LR
6.1IW
22.5IS
86IG
272.6SSS
272.6SAP
2.1SAP
272.6SRV

Properties (8)

additional_info
630074041421201
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE
custom_field_two
2
customer
1
datetime
2021-04-14T22:11:31-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
26643