C 0382_C 0381_04152021_000000.mp4
2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.3 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
9 ft. - Infiltration Runner, at 09 o'clock, within 8 inches of joint: YES
52.9 ft. - Infiltration Gusher, at 09 o'clock, within 8 inches of joint: YES
126 ft. - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - SLUDGE
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 2.3 | SAP | — |
| 651.2 | SSS | — |
| 126 | DSZ | SLUDGE |
| 652.5 | AMH | C 0381 |
| 0 | AMH | C 0382 |
| 651.3 | DSZ | — |
| 52.9 | IG | — |
| 9 | IR | — |
| 0 | MWM | — |
| 2.3 | SSS | — |
| 2.3 | SRV | — |
| 651.2 | SRV | — |
| 616.8 | TFA | — |
| 651.1 | SAP | — |