Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 31, 2021, 08:30 AM
  • 01 1181_01 1180_03312021_014605.mp4

Date
03/31/2021
W/O
885807
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00225
PipeID
P02035
Time
1:30 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8714
Sewer Name
01 WILCOX AVENUE TRUNK
City
BELL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_885807_TV01268_APR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
21 in.
Upstream MH
01 1181
Downstream MH
01 1180
Dir. of Survey
Downstream
Length Surveyed
308.4 ft.
Total Length
308.4 ft.
Structural Index
3
Structural Quick
3U00
Structural Rating
333
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
333
Pipe schematic from manhole 01 1181 to 01 1180
MH: 01 1181MH: 01 1180downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 6 OC'LOCK0 ft. AMH - Upstream Manhole, Survey Begins - 01 11810 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start33.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"46.1 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start90.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"96.4 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish106.9 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start146.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"197.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"277.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"308.4 ft. AMH - Downstream Manhole, Survey Ends - 01 1180308.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish308.4 ft. MGO - General Observation - CONNECTION AT THE MH 12 OC'LOCK308.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    46.1 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    106.9 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
277.2TF
2.1SAV
0MGOCONNECTION AT THE MH 6 OC'LOCK
308.4AMH01 1180
308.4SAV
33.2TF
96.4FL
308.4MGOCONNECTION AT THE MH 12 OC'LOCK
146.4TF
106.9CM
0AMH01 1181
0MGOCONNECTION AT THE MH 3 OC'LOCK
46.1FL
90.9TF
0MWM
0MWL
197.8TF
308.4CM

Properties (7)

additional_info
630074033021206
custom_field_three
AGGREGATE VISIBLE/CRACKS/FRACTURE'S
custom_field_two
2
customer
1
datetime
2021-03-31T01:30:59-07:00
documentation
PROPIPE
is_lateral_inspection
false