Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 1, 2021, 10:25 AM
  • 14 0890_14 0889_04012021_033649.mp4

Date
04/01/2021
W/O
886053
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00579
PipeID
P22365
Time
3:25 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8766
Sewer Name
14 TRUNK "C"
City
PALMDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
24
Purpose
Routine Assessment
Project
WO_886053_TV14020_APR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0890
Downstream MH
14 0889
Dir. of Survey
Downstream
Length Surveyed
353.2 ft.
Total Length
353.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2M00
O&M Rating
140
Overall Index
2
Overall Quick
Overall Rating
140
Pipe schematic from manhole 14 0890 to 14 0889
MH: 14 0890MH: 14 0889downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 08900 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start350.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish353.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0889353.2 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
2DAGS
0AMH14 0890
0MWM
350.9DAGS
353.2AMH14 0889
0MWL
353.2MGOCONNECTION AT MH 3 O'CLOCK

Properties (6)

additional_info
630069033121201
custom_field_two
4
customer
1
datetime
2021-04-01T03:25:28-07:00
documentation
PRO PIPE
is_lateral_inspection
false