Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 2, 2021, 07:48 AM
  • 14 0888_14 0887_04022021_005814.mp4

Date
04/02/2021
W/O
886053
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00579
PipeID
P22363
Time
12:48 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8767
Sewer Name
14 TRUNK "C"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
24
Purpose
Routine Assessment
Project
WO_886053_TV14020_APR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0888
Downstream MH
14 0887
Dir. of Survey
Downstream
Length Surveyed
331.3 ft.
Total Length
331.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2L00
O&M Rating
132
Overall Index
2
Overall Quick
Overall Rating
132
Pipe schematic from manhole 14 0888 to 14 0887
MH: 14 0888MH: 14 0887downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 08870 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start329.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish331.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0887

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
2DAGS
0MWL
0AMH14 0887
0MGOCONNECTION AT MH 9 O'CLOCK
329.7DAGS
331.3AMH14 0887
0MWM

Properties (7)

additional_info
630069040121231
custom_field_three
LIGHT GREASE
custom_field_two
4
customer
1
datetime
2021-04-02T00:48:59-07:00
documentation
PRO PIPE
is_lateral_inspection
false