Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 16, 2021, 07:21 AM
  • B 1097_B 1096_04162021_004658.mp4

Date
04/16/2021
W/O
886008
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01124
PipeID
P13722
Time
12:21 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8732
Sewer Name
B JOINT OUTFALL B - UNIT 6G
City
ALHAMBRA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_886008_TV02344_APR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
B 1097
Downstream MH
B 1096
Dir. of Survey
Downstream
Length Surveyed
856.2 ft.
Total Length
856.2 ft.
Structural Index
3
Structural Quick
3a2a
Structural Rating
855
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
855
Pipe schematic from manhole B 1097 to B 1096
MH: B 1097MH: B 1096downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 10970 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. MWM - Water Mark, 35 %of cross sectional area216 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"326.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"611.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"633.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"638.7 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"726.4 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"807 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"821.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"856.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish856.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish856.2 ft. AMH - Downstream Manhole, Survey Ends - B 1096

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    216 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"

    633.8 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"

Observations (17)

DistanceCodeObservation
2.3SAP
216TFC
0MWL
856.2SSS
0AMHB 1097
0MGOCONNECTION AT THE MH 3 OC'LOCK
2.3SSS
821.5TF
2.3MWM
326.2TF
856.2SAP
633.8TFC
807TFC
856.2AMHB 1096
638.7TFC
726.4TFC
611.4TF

Properties (7)

additional_info
630074041521203
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2021-04-16T00:21:52-07:00
documentation
PROPIPE
is_lateral_inspection
false