Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 16, 2021, 08:35 AM
  • B 1095_B 1094_04162021_022222.mp4

Date
04/16/2021
W/O
886008
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01124
PipeID
P13720
Time
1:35 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8732
Sewer Name
B JOINT OUTFALL B - UNIT 6G
City
ALHAMBRA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_886008_TV02344_APR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
B 1095
Downstream MH
B 1094
Dir. of Survey
Downstream
Length Surveyed
835.4 ft.
Total Length
835.4 ft.
Structural Index
3
Structural Quick
3`2`
Structural Rating
830
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
830
Pipe schematic from manhole B 1095 to B 1094
MH: B 1095MH: B 1094downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 10940 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area3.8 ft. MGO - General Observation - MAG COAT3.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start835.4 ft. AMH - Downstream Manhole, Survey Ends - B 1094835.4 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK835.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish835.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0AMHB 1094
0MWL
3.8MGOMAG COAT
3.8SAP
835.4AMHB 1094
835.4MGOCONNECTION AT THE MH 3 OC'LOCK
3.8SSS
835.4SAP
0MWM
835.4SSS

Properties (7)

additional_info
630074041521203
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2021-04-16T01:35:31-07:00
documentation
PROPIPE
is_lateral_inspection
false