Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 12, 2021, 10:24 AM
  • C 0306_C 0305_04122021_033625.mp4

Date
04/12/2021
W/O
885817
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00134
PipeID
P09766
Time
3:24 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8726
Sewer Name
C JOINT OUTFALL C - UNIT 6E
City
CERRITOS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_885817_TV19035_APR2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
21 in.
Upstream MH
C 0305
Downstream MH
C 0306
Dir. of Survey
Upstream
Length Surveyed
290.3 ft.
Total Length
290.3 ft.
Structural Index
2
Structural Quick
2J00
Structural Rating
114
O&M Index
2
O&M Quick
3122
O&M Rating
7
Overall Index
2
Overall Quick
Overall Rating
121
Pipe schematic from manhole C 0305 to C 0306
MH: C 0305MH: C 0306upstream0 ft. AMH - Upstream Manhole, Survey Ends - C 03060 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK2.3 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - POSSIBLE DEBRIS2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish32.6 ft. DAE - Deposits Attached Encrustation, 15 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES59.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"67.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"107.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"115.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"155 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"163.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"202.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"211.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"259.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"267.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"286.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start286.3 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - POSSIBLE DEBRIS287.1 ft. MGO - General Observation - MAG COAT290.3 ft. MWL - Water Level, 10 %of cross sectional area290.3 ft. AMH - Downstream Manhole, Survey Begins - C 0305290.3 ft. MWM - Water Mark, 30 %of cross sectional area

Observation photos (1)

  • Deposits Attached Encrustation, 15 %of cross sectional area, from 12 to 04 o'clock,  , within 8 inches of joint: YES

    257.7 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES

Observations (22)

DistanceCodeObservation
3.2MGOMAG COAT
290.3AMHC 0306
4SSS
0MWL
290.3MGOCONNECTION AT THE MH 9 OC'LOCK
127TFC
257.7DAE
183.1TFC
135.3TFC
290.3MGOCONNECTION AT THE MH 3 OC'LOCK
288DSZPOSSIBLE DEBRIS
30.5TFC
231.2TFC
87.4TFC
0AMHC 0305
223.2TFC
4DSZPOSSIBLE DEBRIS
22.9TFC
288SSS
175.1TFC
79TFC
0MWM

Properties (7)

additional_info
630074041221001
custom_field_three
ENCRUSTATION
custom_field_two
3
customer
1
datetime
2021-04-12T03:24:26-07:00
documentation
PROPIPE
is_lateral_inspection
false