Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 12, 2021, 08:26 AM
  • C 0303_C 0302_04122021_014118.mp4

Date
04/12/2021
W/O
885817
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00134
PipeID
P09763
Time
1:26 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8726
Sewer Name
C JOINT OUTFALL C - UNIT 6E
City
CERRITOS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_885817_TV19035_APR2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
C 0303
Downstream MH
C 0302
Dir. of Survey
Downstream
Length Surveyed
290.6 ft.
Total Length
290.6 ft.
Structural Index
3
Structural Quick
3J2I
Structural Rating
271
O&M Index
2
O&M Quick
412L
O&M Rating
132
Overall Index
2
Overall Quick
Overall Rating
403
Pipe schematic from manhole C 0303 to C 0302
MH: C 0303MH: C 0302downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - C 03030 ft. MWM - Water Mark, 60 %of cross sectional area2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start3.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start17.4 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start20.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"28.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"39.2 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish39.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start68.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"76.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"101.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"109.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"132.9 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"133.8 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"149.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"157.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"197.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"205.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"253.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"258.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES261.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"274 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 11 to 04 o'clock, , within 8 inches of joint: YES290.6 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK290.6 ft. AMH - Downstream Manhole, Survey Ends - C 0302290.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish290.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish290.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (6)

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    17.4 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    39.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 04 o'clock,  , within 8 inches of joint: YES

    258.7 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 11 to 04 o'clock,  , within 8 inches of joint: YES

    274 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 11 to 04 o'clock, , within 8 inches of joint: YES

Observations (29)

DistanceCodeObservation
157.5TFC
3.4SAV
133.8TF
290.6MGOCONNECTION AT THE MH 9 OC'LOCK
17.4DAE
197.5TFC
205.5TFC
28.3TFC
258.7DAE
290.6AMHC 0302
274DAE
290.6SSS
39.3SSS
2.1DAGS
76.6TFC
109.2TFC
132.9TFA
0MWL
39.2DAE
101.2TFC
290.6SAV
68.8TFC
0AMHC 0303
253.9TFC
290.6DAGS
261.8TFC
149.1TFC
0MWM
20.4TFC

Properties (7)

additional_info
630074041221001
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2021-04-12T01:26:27-07:00
documentation
PROPIPE
is_lateral_inspection
false