Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 13, 2021, 05:12 AM
  • C 0290_C 0289_04122021_222245.mp4

Date
04/12/2021
W/O
885817
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00134
PipeID
P09750
Time
10:12 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8727
Sewer Name
C JOINT OUTFALL C - UNIT 6E
City
LAKEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
06
Purpose
Routine Assessment
Project
RFIR_WO_885817_TV19035_APR2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
27 in.
Upstream MH
C 0290
Downstream MH
C 0289
Dir. of Survey
Downstream
Length Surveyed
314.3 ft.
Total Length
314.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2L00
O&M Rating
126
Overall Index
2
Overall Quick
Overall Rating
126
Pipe schematic from manhole C 0290 to C 0289
MH: C 0290MH: C 0289downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - C 02903.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Start3.5 ft. MGO - General Observation - MAG COAT36 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"43.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"91.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"100.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"204.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"236.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"244.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"288 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 12 o'clock, , within 8 inches of joint: YES292.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"301.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"314.3 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Finish314.3 ft. AMH - Downstream Manhole, Survey Ends - C 0289314.3 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK CAPPED

Observations (18)

DistanceCodeObservation
244.5TFC
3.5DSZ
100.2TFC
292.9TFC
204.3TFC
236.5TFC
43.8TFC
301.3TFC
314.3DSZ
0MWM
3.5MGOMAG COAT
0MWL
288DAE
314.3AMHC 0289
91.6TFC
0AMHC 0290
314.3MGOCONNECTION AT THE MH 3 OC'LOCK CAPPED
36TFC

Properties (7)

additional_info
630074041221201
custom_field_three
NO SEVERE DEFECTS
custom_field_two
3
customer
1
datetime
2021-04-12T22:12:15-07:00
documentation
PROPIPE
is_lateral_inspection
false