Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 14, 2021, 05:15 AM
  • 05 0732_05 0731_04132021_223530.mp4

Date
04/13/2021
W/O
887836
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00521
PipeID
P05955
Time
10:15 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8829
Sewer Name
05 SOUTH INGLEWOOD-ORANGE AVENUE TRUNK, EXTENSION #1
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
07
Purpose
Routine Assessment
Project
CA_WO_887836
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
05 0732
Downstream MH
05 0731
Dir. of Survey
Downstream
Length Surveyed
244 ft.
Total Length
244 ft.
Structural Index
4
Structural Quick
4D3D
Structural Rating
165
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
3
Overall Quick
Overall Rating
166
Pipe schematic from manhole 05 0732 to 05 0731
MH: 05 0732MH: 05 0731downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 07328.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"38 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES42.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"84.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"92.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"124.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start124.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish149.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"164.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"193.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"242.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish244 ft. MGO - General Observation - CONNECTION AT MH, 3 AND 9 O'CLOCK244 ft. AMH - Downstream Manhole, Survey Ends - 05 0731

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES

    38 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    124.2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
149.3TF
244MGOCONNECTION AT MH, 3 AND 9 O'CLOCK
193.6TF
0MWM
27.8TF
124.2FM
164.2TF
38RFJ
124.2CM
0MWL
0AMH05 0732
42.6TF
8.4CM
92.9TF
244AMH05 0731
242.2FM
84.3TF

Properties (6)

custom_field_three
FRACTURES THROUGHOUT
custom_field_two
2
customer
1
datetime
2021-04-13T22:15:57-07:00
documentation
PRO PIPE
is_lateral_inspection
false