Wastewater/Activity/PacpInspection/1.0Apr 29, 2021, 08:49 AM
  • J 0237_J 0236_4292021_015708.mp4

Date
04/29/2021
W/O
0879983
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00057
PipeID
P11483
Time
1:49 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1789
Sewer Name
J JOINT OUTFALL J - UNIT 1E
City
PALOS VERDES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
46
Purpose
Capital Improvement Program Assesment
Project
20210428MDM_JOINT_OUTFALL_J_UNIT_1E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
J 0237
Downstream MH
J 0236
Dir. of Survey
Downstream
Length Surveyed
349.7 ft.
Total Length
349.7 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
12
Pipe schematic from manhole J 0237 to J 0236
MH: J 0237MH: J 0236downstream0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Capped0 ft. AMH - Upstream Manhole, Survey Begins - 1:55AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC44.2 ft. SAV - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG VERY SPORATIC182.4 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - ROCKS SLUDGE201.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE349.2 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - ROCKS SLUDGE349.2 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Capped349.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC349.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE349.7 ft. AMH - Downstream Manhole, Survey Ends - 2:15AM

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG VERY SPORATIC

    44.2 ft. - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG VERY SPORATIC

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

    201.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

Observations (14)

DistanceCodeObservation
201.9SSSBLISTERING CONCRETE
44.2SAVSEVERE AGG VERY SPORATIC
0MGOConn. @ Mh, 9 O' Clock. Capped
2SSSBLISTERING PEELING CONCRETE
0AMH1:55AM
349.2DSZROCKS SLUDGE
349.7AMH2:15AM
0MWM
0MWL
182.4DSZROCKS SLUDGE
349.2MGOConn. @ Mh, 9 O' Clock. Capped
2SAVSEVERE AGG SPORATIC
349.2SAVSEVERE AGG SPORATIC
349.2SSSBLISTERING PEELING CONCRETE

Properties (6)

custom_field_three
SEVERE AGG VISIBLE SPORATIC
custom_field_two
3
customer
LACSD
datetime
2021-04-29T01:49:04-07:00
documentation
MARTIN,OLIVER 111,CASTILLO,BARR
is_lateral_inspection
false