30 0069_30 0068_532021_024444.mp4
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
12.3 ft. - Material Change, Vitrified clay pipe
41.8 ft. - Fracture Circumferential, from 08 to 12 o'clock, within 8 inches of joint: YES - SLIGHT
85.8 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG 1 SECTION RCP
91.4 ft. - Material Change, Reinforced concrete pipe
91.4 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
94.8 ft. - Repair Patch, from 12 to 05 o'clock, within 8 inches of joint: YES - CONCRETE PATCH
143.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
191.9 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 205.1 | SSS | BLISTERING PEELING CONCRETE |
| 94.8 | RPP | CONCRETE PATCH |
| 205.8 | AMH | 3:25AM |
| 44.2 | DSZ | SLUDGE |
| 12.3 | MMC | — |
| 191.9 | SRV | CIRCUM REBAR |
| 36 | FC | HAILINE |
| 41.8 | FC | SLIGHT |
| 0 | AMH | 2:45AM |
| 205.1 | DSZ | SLUDGE |
| 2 | SAM | SEVERE AGG |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 0 | MWL | — |
| 205.1 | SAM | SEVERE AGG |
| 143.3 | SSS | BLISTERING PEELING CONCRETE |
| 85.8 | SAM | SEVERE AGG 1 SECTION RCP |
| 91.4 | MMC | — |
| 66.4 | FL | H |
| 205.1 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 52.6 | FC | H |
| 91.4 | SAM | SEVERE AGG |
| 15.4 | FC | SLIGHT |
| 12.9 | DSZ | SLUDGE |
| 104.6 | DSZ | SLUDGE ROCKS |
| 64.5 | FL | H |
| 0 | MWM | — |
| 12.3 | SAM | SEVERE AGG |