Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 17, 2021, 09:10 AM
  • 01 1120_01 1119_03172021_022316.mp4

Date
03/17/2021
W/O
880430
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00210
PipeID
P01971
Time
2:10 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8751
Sewer Name
01 HUNTINGTON PARK TRUNK
City
HUNTINGTON PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_880430_TV01247_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
24 in.
Upstream MH
01 1120
Downstream MH
01 1119
Dir. of Survey
Downstream
Length Surveyed
276.1 ft.
Total Length
276.1 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
270
O&M Index
2
O&M Quick
2J00
O&M Rating
108
Overall Index
2
Overall Quick
Overall Rating
378
Pipe schematic from manhole 01 1120 to 01 1119
MH: 01 1120MH: 01 1119downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 01 11202 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start22.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"35.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"36.8 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"78.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN85.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN103.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6", 6" - OPEN126.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN132.2 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN179.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN181.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN232.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"250.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"265.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"273 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN274 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish274.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish274.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish276.1 ft. AMH - Downstream Manhole, Survey Ends - 01 1119276.1 ft. MGO - General Observation - ROACHES @ MH

Observation photos (4)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    276.1 ft. - General Observation - ROACHES @ MH

Observations (26)

DistanceCodeObservation
250.7TFA
35.6TFC
232.1TFA
0MWL
36.8TBA
85.4TFOPEN
265.6TFA
132.2TBOPEN
274.3CM
126.4TFOPEN
78.1TFOPEN
103.4TFOPEN
276.1AMH01 1119
181.6TFOPEN
0MWM
179.5TFOPEN
274.3DAGS
2DAGS
22.4TFA
273TFOPEN
2SSS
0MGOROACHES @ MH
2CM
276.1MGOROACHES @ MH
274SSS
0AMH01 1120

Properties (7)

additional_info
630069031621201
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-03-17T02:10:21-07:00
documentation
PRO PIPE
is_lateral_inspection
false