Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 18, 2021, 06:38 AM
  • 01 1144A_01 1144_03172021_234655.mp4

Date
03/17/2021
W/O
880430
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00210
PipeID
P01996
Time
11:38 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8752
Sewer Name
01 HUNTINGTON PARK TRUNK
City
HUNTINGTON PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_880430_TV01247_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
15 in.
Upstream MH
01 1144A
Downstream MH
01 1144
Dir. of Survey
Downstream
Length Surveyed
238.6 ft.
Total Length
238.6 ft.
Structural Index
2
Structural Quick
3E2H
Structural Rating
187
O&M Index
2
O&M Quick
2H00
O&M Rating
94
Overall Index
2
Overall Quick
Overall Rating
281
Pipe schematic from manhole 01 1144A to 01 1144
MH: 01 1144AMH: 01 1144downstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 1144A2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start151.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"152.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"235.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish235.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish236 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish238.6 ft. MGO - General Observation - ROACHES @ MH238.6 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN238.6 ft. AMH - Downstream Manhole, Survey Ends - 01 1144

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    238.6 ft. - General Observation - ROACHES @ MH

Observations (15)

DistanceCodeObservation
235.9DAGS
2CM
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
0MWM
238.6MGOROACHES @ MH
151.5TFC
238.6MGOCONN @ MH 9 O'CLOCK/UNKNOWN
238.6AMH01 1144
152.8TFC
2SSS
0MWL
235.9CM
236SSS
0AMH01 1144A
2DAGS

Properties (8)

additional_info
630069031721201
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-03-17T23:38:07-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
10602