Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 18, 2021, 04:53 AM
  • 01 1138_01 1137_03172021_220150.mp4

Date
03/17/2021
W/O
880430
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00210
PipeID
P01989
Time
9:53 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8752
Sewer Name
01 HUNTINGTON PARK TRUNK
City
HUNTINGTON PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_880430_TV01247_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
18 in.
Upstream MH
01 1137
Downstream MH
01 1138
Dir. of Survey
Upstream
Length Surveyed
216.6 ft.
Total Length
216.6 ft.
Structural Index
2
Structural Quick
3F2G
Structural Rating
183
O&M Index
2
O&M Quick
2H00
O&M Rating
86
Overall Index
2
Overall Quick
Overall Rating
269
Pipe schematic from manhole 01 1137 to 01 1138
MH: 01 1137MH: 01 1138upstream0 ft. AMH - Upstream Manhole, Survey Ends - 01 11380 ft. MGO - General Observation - ROACHES @ MH1.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish1.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish30.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN36.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN37.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN69.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN95.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN118.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN144 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN164.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start184.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN203.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"214.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start214.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start216.6 ft. MWL - Water Level, 20 %of cross sectional area216.6 ft. AMH - Downstream Manhole, Survey Begins - 01 1137216.6 ft. MWM - Water Mark, 25 %of cross sectional area

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    52.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
97.8TFOPEN
32.3TFOPEN
2DAGS
0MWL
2SSS
0AMH01 1137
178.8TFOPEN
180.5TFOPEN
121.5TFOPEN
214.9DAGS
13.2TFC
72.6TFOPEN
214.9CM
146.9TFOPEN
216.6AMH01 1138
0MWM
185.7TFOPEN
52.2CM
216.6MGOROACHES @ MH
214SSS

Properties (7)

additional_info
630069031721201
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-03-17T21:53:22-07:00
documentation
PRO PIPE
is_lateral_inspection
false