Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 18, 2021, 04:40 AM
  • 01 1137_01 1136_03172021_214936.mp4

Date
03/17/2021
W/O
880430
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00210
PipeID
P01988
Time
9:40 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8752
Sewer Name
01 HUNTINGTON PARK TRUNK
City
HUNTINGTON PARK
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_880430_TV01247_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
18 in.
Upstream MH
01 1137
Downstream MH
01 1136
Dir. of Survey
Downstream
Length Surveyed
192.2 ft.
Total Length
192.2 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
190
O&M Index
2
O&M Quick
2G00
O&M Rating
76
Overall Index
2
Overall Quick
Overall Rating
266
Pipe schematic from manhole 01 1137 to 01 1136
MH: 01 1137MH: 01 1136downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MGO - General Observation - CONN @ MH 6 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 11372 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start54.8 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 6" - OPEN55.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"76.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN107.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6" - OPEN145.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN190 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish190.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish190.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish192.2 ft. MGO - General Observation - ROACHES @ MH192.2 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE192.2 ft. AMH - Downstream Manhole, Survey Ends - 01 1136

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    192.2 ft. - General Observation - ROACHES @ MH

Observations (19)

DistanceCodeObservation
0MWM
0MGOROACHES @ MH
0MGOCONN @ MH 6 O'CLOCK/ACTIVE
2DAGS
190.2CM
192.2MGOROACHES @ MH
55.4TFC
192.2MGOCONN @ MH 9 O'CLOCK/ACTIVE
190SSS
107.5TFOPEN
192.2AMH01 1136
54.8TBOPEN
0MWL
190.2DAGS
2CM
0AMH01 1137
145.8TFOPEN
76.9TFOPEN
2SSS

Properties (7)

additional_info
630069031721201
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-03-17T21:40:07-07:00
documentation
PRO PIPE
is_lateral_inspection
false