Wastewater/Activity/PacpInspection/1.0Mar 17, 2021, 05:26 AM
  • 01 1128_01 1127_03162021_223338.mp4

Date
03/16/2021
W/O
880430
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00210
PipeID
P01980
Time
10:26 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8751
Sewer Name
01 HUNTINGTON PARK TRUNK
City
HUNTINGTON PARK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_880430_TV01247_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
24 in.
Upstream MH
01 1128
Downstream MH
01 1127
Dir. of Survey
Downstream
Length Surveyed
185.5 ft.
Total Length
185.5 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
180
O&M Index
2
O&M Quick
2F00
O&M Rating
72
Overall Index
2
Overall Quick
Overall Rating
252
Pipe schematic from manhole 01 1128 to 01 1127
MH: 01 1128MH: 01 1127downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 11280 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start88.4 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN183 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish183.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish183.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish185.5 ft. AMH - Downstream Manhole, Survey Ends - 01 1127185.5 ft. MGO - General Observation - ROACHES@ MH185.5 ft. MGO - General Observation - CONN @ MH 12 O'CLOCK/CAPPED185.5 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (4)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - ROACHES@ MH

    185.5 ft. - General Observation - ROACHES@ MH

Observations (15)

DistanceCodeObservation
183.2DAGS
185.5AMH01 1127
183SSS
2CM
185.5MGOROACHES@ MH
0MGOROACHES @ MH
2DAGS
0MWL
183.2CM
185.5MGOCONN @ MH 12 O'CLOCK/CAPPED
0AMH01 1128
2SSS
0MWM
88.4TBOPEN
185.5MGOCONN @ MH 9 O'CLOCK/ACTIVE

Properties (7)

additional_info
630069031621201
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-03-16T22:26:14-07:00
documentation
PRO PIPE
is_lateral_inspection
false