Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 17, 2021, 08:23 AM
  • 18 1074_18 1073_03172021_014526.mp4

Date
03/17/2021
W/O
880296
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00682
PipeID
P14933
Time
1:23 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8640
Sewer Name
18 LA HABRA HEIGHTS TRUNK, SECTION 5
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_880296_TV18185_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
18 1074
Downstream MH
18 1073
Dir. of Survey
Downstream
Length Surveyed
208.9 ft.
Total Length
208.9 ft.
Structural Index
3
Structural Quick
4134
Structural Rating
17
O&M Index
1
O&M Quick
1300
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
20
Pipe schematic from manhole 18 1074 to 18 1073
MH: 18 1074MH: 18 1073downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 10747 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES9.9 ft. FS - Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES13.2 ft. FS - Fracture Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES22.2 ft. JOM - Joint Offset Medium28.3 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start37.6 ft. FS - Fracture Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES81.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"125.9 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES144.1 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start157.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"157.3 ft. RFL - Roots Fine Lateral, from 08 to 04 o'clock191.9 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish207.3 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish208.9 ft. AMH - Downstream Manhole, Survey Ends - 18 1073

Observation photos (9)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES

    9.9 ft. - Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES

    13.2 ft. - Fracture Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES

  • Joint Offset Medium

    22.2 ft. - Joint Offset Medium

  • Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    28.3 ft. - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES

    37.6 ft. - Fracture Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES

    125.9 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    144.1 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Lateral, from 08 to 04 o'clock

    157.3 ft. - Roots Fine Lateral, from 08 to 04 o'clock

Observations (18)

DistanceCodeObservation
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
28.3CM
13.2FS
7FM
0MWM
0MWL
37.6FS
208.9AMH18 1073
144.1RFJ
157.3TF
81.5TF
22.2JOM
125.9RFJ
157.3RFL
191.9RFJ
0AMH18 1074
207.3CM
9.9FS

Properties (6)

custom_field_three
CRACKS, FRACTURES
custom_field_two
3
customer
1
datetime
2021-03-17T01:23:52-07:00
documentation
PRO PIPE
is_lateral_inspection
false