20 0135_20 0134A_04152021_025304.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
5.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
14 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
14 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - debris
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 134.4 | AMH | 20 0134A |
| 131.9 | DSC | — |
| 5.2 | SAP | — |
| 14 | DSC | — |
| 134.4 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 131.9 | SAP | — |
| 2 | DAGS | — |
| 131.9 | DAGS | — |
| 0 | AMH | 20 0135 |
| 31.2 | TFC | — |
| 14 | DSZ | debris |
| 0 | MWM | — |