20 0121_20 0120_04152021_223407.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
154.1 ft. - Water Level, 50 %of cross sectional area
168.6 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS
373.6 ft. - Obstacles Pipe Material, 60 %of cross sectional area, from 08 to 04 o'clock
373.6 ft. - Survey Abandoned - DUE TO OBSTACLE/PIPE MATERIAL.
| Distance | Code | Observation |
|---|---|---|
| 370.1 | TFC | — |
| 168.6 | DSZ | DEBRIS |
| 154.1 | MWL | — |
| 79.7 | TFC | — |
| 373.6 | OBM | — |
| 176.9 | TFC | — |
| 2 | DAGS | — |
| 0 | MWL | — |
| 373.6 | SAP | — |
| 281.4 | TFC | — |
| 75.4 | TFC | — |
| 366.1 | TFC | — |
| 0 | AMH | 20 0121 |
| 2 | SSS | — |
| 0 | MWM | — |
| 373.6 | SSS | — |
| 373.6 | DAGS | — |
| 181.1 | TFC | — |
| 373.6 | MSA | DUE TO OBSTACLE/PIPE MATERIAL. |
| 277.3 | TFC | — |
| 2 | SAP | — |