Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 25, 2021, 10:15 AM
  • 15 0452_15 0451_03252021_032753.mp4

Date
03/25/2021
W/O
885811
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00621
PipeID
P12377
Time
3:15 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8700
Sewer Name
15 POTRERO AVENUE TRUNK
City
SOUTH EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
21
Purpose
Routine Assessment
Project
WO_885811_TV15101_APR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0452
Downstream MH
15 0451
Dir. of Survey
Downstream
Length Surveyed
325 ft.
Total Length
325 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
189
O&M Index
2
O&M Quick
2L00
O&M Rating
128
Overall Index
3
Overall Quick
Overall Rating
317
Pipe schematic from manhole 15 0452 to 15 0451
MH: 15 0452MH: 15 0451downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 15 04520 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start8.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start72.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"97.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"108.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"141.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"144.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"163 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"225.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"245.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"261.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"299.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"322.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish322.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish325 ft. AMH - Downstream Manhole, Survey Ends - 15 0451

Observation photos (3)

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
141.7TFC
299.9TFA
225.3TFA
322.9DAGS
245.9TFA
72.8TFC
0MGOCONNECTION AT MH 9 O'CLOCK
97.2TFA
8.3SAP
163TFA
2MGOMAG COATING THROUGHOUT
0AMH15 0452
144.3TFA
325AMH15 0451
0MWL
0MWM
0MGOCOCKROACHES IN MANHOLE
322.9SAP
2DAGS
108.7TFA
261.4TFA

Properties (7)

additional_info
630069032521201
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-03-25T03:15:42-07:00
documentation
PRO PIPE
is_lateral_inspection
false