Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 25, 2021, 11:20 AM
  • 15 0449_15 0448_03252021_043418.mp4

Date
03/25/2021
W/O
885811
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00621
PipeID
P12374
Time
4:20 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8700
Sewer Name
15 POTRERO AVENUE TRUNK
City
SOUTH EL MONTE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
21
Purpose
Routine Assessment
Project
WO_885811_TV15101_APR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0449
Downstream MH
15 0448
Dir. of Survey
Downstream
Length Surveyed
372.5 ft.
Total Length
372.5 ft.
Structural Index
3
Structural Quick
3N2J
Structural Rating
332
O&M Index
2
O&M Quick
412N
O&M Rating
152
Overall Index
2
Overall Quick
Overall Rating
484
Pipe schematic from manhole 15 0449 to 15 0448
MH: 15 0449MH: 15 0448downstream0 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 15 04490 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start12.5 ft. MGO - General Observation - MAG COATING THROUGHOUT90.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"93.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start102.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"204.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"222.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"238.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"242.3 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"370.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish370.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish370.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish372.5 ft. AMH - Downstream Manhole, Survey Ends - 15 0448372.5 ft. MGO - General Observation - CONNECTION AT MH 12 O'CLOCK372.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (6)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    12.5 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    93.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    372.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (21)

DistanceCodeObservation
2SAP
372.5AMH15 0448
370.7SAP
90.8TFC
102.4TFA
372.5MGOCONNECTION AT MH 12 O'CLOCK
2DAGS
204.3TFC
0MGOCONNECTION AT MH 6 O'CLOCK
12.5MGOMAG COATING THROUGHOUT
0AMH15 0449
0MWM
0MGOCOCKROACHES IN MANHOLE
370.7DAGS
238.3TFC
370.7SSS
93.8SSS
0MWL
222.6TFC
242.3TBA
372.5MGOCOCKROACHES IN MANHOLE

Properties (7)

additional_info
630069032521201
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-03-25T04:20:24-07:00
documentation
PRO PIPE
is_lateral_inspection