Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 26, 2021, 04:46 AM
  • 15 0446_15 0445_03252021_220933.mp4

Date
03/25/2021
W/O
885811
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00621
PipeID
P12371
Time
9:46 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8758
Sewer Name
15 POTRERO AVENUE TRUNK
City
SOUTH EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
21
Purpose
Routine Assessment
Project
WO_885811_TV15101_APR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0446
Downstream MH
15 0445
Dir. of Survey
Downstream
Length Surveyed
439.7 ft.
Total Length
439.7 ft.
Structural Index
3
Structural Quick
3Q2Q
Structural Rating
440
O&M Index
2
O&M Quick
4936
O&M Rating
230
Overall Index
2
Overall Quick
Overall Rating
670
Pipe schematic from manhole 15 0446 to 15 0445
MH: 15 0446MH: 15 0445downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 04462 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"12.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"38.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"57 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"108 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"108.7 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"117.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"159.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"172.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"193.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"211.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"231.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"253.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"280.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"304.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"331.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"355.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"383.9 ft. MWL - Water Level, 60 %of cross sectional area394.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"399.2 ft. MCU - Camera Underwater, Start399.2 ft. MWL - Water Level, 70 %of cross sectional area411.5 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIS439.7 ft. AMH - Downstream Manhole, Survey Ends - 15 0445439.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish439.7 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish439.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish439.7 ft. MCU - Camera Underwater, Finish439.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Water Level, 60 %of cross sectional area

    383.9 ft. - Water Level, 60 %of cross sectional area

Observations (35)

DistanceCodeObservation
193.3TFC
0MWM
280.3TFC
304.4TFC
2SAP
394.9TF
0MGOCOCKROACHES IN MANHOLE
331.8TF
0MWL
439.7AMH15 0445
57TFC
439.7DAGS
2DAGS
0AMH15 0446
38.9TFA
355.5TF
439.7DSZ
399.2MCU
159.5TFC
231.9TFC
6TFA
108TFC
211.1TFC
108.7TBA
439.7SSS
117.2TFC
253.3TFC
439.7MCU
172.1TFA
411.5DSZDEBRIS
383.9MWL
399.2MWL
439.7SAP
12.4TF
2SSS

Properties (7)

additional_info
630069032521201
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-03-25T21:46:57-07:00
documentation
PRO PIPE
is_lateral_inspection
false