Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 4, 2021, 08:18 AM
  • 14 0096_14 0095_03042021_012926.mp4

Date
03/04/2021
W/O
879965
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00577
PipeID
P18113
Time
12:18 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8589
Sewer Name
14 TRUNK "A"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
18
Purpose
Routine Assessment
Project
WO_879965_TV14017_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0096
Downstream MH
14 0095
Dir. of Survey
Downstream
Length Surveyed
262.5 ft.
Total Length
262.5 ft.
Structural Index
2
Structural Quick
2I00
Structural Rating
104
O&M Index
2
O&M Quick
2I00
O&M Rating
104
Overall Index
2
Overall Quick
Overall Rating
208
Pipe schematic from manhole 14 0096 to 14 0095
MH: 14 0096MH: 14 0095downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 00962 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start27.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"54.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"77.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"100.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"127.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"150.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"158 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN177.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"200.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"227.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"253.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"260 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish260.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish262.5 ft. AMH - Downstream Manhole, Survey Ends - 14 0095262.5 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
150.3TFC
100.7TFC
158TBOPEN
200.5TFC
77.7TFC
260.3DAGS
27.6TFC
54.8TFC
260SSS
253.9TFC
2SSS
0MWM
127.4TFC
177.4TFC
2DAGS
262.5AMH14 0095
227.1TFC
262.5MGOCONN @ MH 3 O'CLOCK/ACTIVE
0MWL
0AMH14 0096

Properties (7)

additional_info
630069030321201
custom_field_three
CRACKS/FRACTURES
custom_field_two
3
customer
1
datetime
2021-03-04T00:18:50-08:00
documentation
PRO PIPE
is_lateral_inspection
false