Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 18, 2021, 05:36 AM
  • 15 0108_15 0107_03172021_225101.mp4

Date
03/17/2021
W/O
880288
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00590
PipeID
P11986
Time
10:36 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8642
Sewer Name
15 ABBEY STREET TRUNK
City
LA PUENTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
38
Purpose
Routine Assessment
Project
RFIR_WO_880288_TV15245_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
15 0108
Downstream MH
15 0107
Dir. of Survey
Downstream
Length Surveyed
160.2 ft.
Total Length
160.2 ft.
Structural Index
3
Structural Quick
413K
Structural Rating
252
O&M Index
2
O&M Quick
2E00
O&M Rating
62
Overall Index
3
Overall Quick
Overall Rating
314
Pipe schematic from manhole 15 0108 to 15 0107
MH: 15 0108MH: 15 0107downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 01080 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start42.5 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES57.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8" - OPEN111.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8" - OPEN128.2 ft. FS - Fracture Spiral, from 12 to 05 o'clock, within 8 inches of joint: YES158 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish158.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish158.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish160.2 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE160.2 ft. AMH - Downstream Manhole, Survey Ends - 15 0107

Observation photos (5)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

    42.5 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 12 to 05 o'clock, within 8 inches of joint: YES

    128.2 ft. - Fracture Spiral, from 12 to 05 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
158.5DAGS
2CM
57.2TFOPEN
2SSS
160.2MGOCONN @ MH 3 O'CLOCK/ACTIVE
42.5FM
158SSS
7DAGS
0MWL
158.5CM
0MWM
2DAGS
111.3TFOPEN
0AMH15 0108
128.2FS
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
160.2AMH15 0107

Properties (6)

custom_field_three
CRACKS, FRACTURES
custom_field_two
3
customer
1
datetime
2021-03-17T22:36:29-07:00
documentation
PRO PIPE
is_lateral_inspection
false