Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 18, 2021, 04:56 AM
  • 15 0106_15 0105_03172021_221719.mp4

Date
03/17/2021
W/O
880288
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00590
PipeID
P11984
Time
9:56 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8642
Sewer Name
15 ABBEY STREET TRUNK
City
LA PUENTE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
38
Purpose
Routine Assessment
Project
RFIR_WO_880288_TV15245_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
15 0106
Downstream MH
15 0105
Dir. of Survey
Downstream
Length Surveyed
225.2 ft.
Total Length
225.2 ft.
Structural Index
2
Structural Quick
3H2Q
Structural Rating
319
O&M Index
2
O&M Quick
2H00
O&M Rating
88
Overall Index
2
Overall Quick
Overall Rating
407
Pipe schematic from manhole 15 0106 to 15 0105
MH: 15 0106MH: 15 0105downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 01060 ft. MWL - Water Level, 30 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Start7.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"41.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"45.6 ft. FS - Fracture Spiral, from 04 to 05 o'clock, within 8 inches of joint: YES, Start48.6 ft. FS - Fracture Spiral, from 04 to 05 o'clock, within 8 inches of joint: YES, Finish83.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"84.9 ft. CS - Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES111 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"144.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"159 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"161.2 ft. FS - Fracture Spiral, from 03 to 09 o'clock, within 8 inches of joint: YES186.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"220 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Finish221.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish223 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish224.5 ft. FC - Fracture Circumferential, from 07 to 12 o'clock, within 8 inches of joint: NO224.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish225.2 ft. AMH - Downstream Manhole, Survey Ends - 15 0105

Observation photos (7)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Water Level, Sag in pipe, 20 %of cross sectional area, Start

    4 ft. - Water Level, Sag in pipe, 20 %of cross sectional area, Start

  • Fracture Spiral, from 04 to 05 o'clock, within 8 inches of joint: YES, Start

    45.6 ft. - Fracture Spiral, from 04 to 05 o'clock, within 8 inches of joint: YES, Start

  • Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES

    84.9 ft. - Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 03 to 09 o'clock, within 8 inches of joint: YES

    161.2 ft. - Fracture Spiral, from 03 to 09 o'clock, within 8 inches of joint: YES

  • Fracture Circumferential, from 07 to 12 o'clock, within 8 inches of joint: NO

    224.5 ft. - Fracture Circumferential, from 07 to 12 o'clock, within 8 inches of joint: NO

Observations (24)

DistanceCodeObservation
0MWM
220MWLS
159TFC
83.7TFC
45.6FS
224.5FC
111TFC
48.6FS
84.9CS
7.5TFC
0AMH15 0106
41.2TFA
2CM
144.8TFC
2SSS
186.5TFA
223SSS
2.2DAGS
4MWLS
225.2AMH15 0105
224.5DAGS
221.9CM
161.2FS
0MWL

Properties (6)

custom_field_three
FRACTURES, SAGS THROUGHOUT
custom_field_two
3
customer
1
datetime
2021-03-17T21:56:11-07:00
documentation
PRO PIPE
is_lateral_inspection
false