Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 16, 2021, 04:58 AM
  • 18 0423_18 0422_03152021_221041.mp4

Date
03/15/2021
W/O
879992
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00699
PipeID
P14258
Time
9:58 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8637
Sewer Name
18 SANTA FE STREET RELIEF TRUNK
City
S.WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
WO_879992_TV18044_MAR2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0423
Downstream MH
18 0422
Dir. of Survey
Downstream
Length Surveyed
198.8 ft.
Total Length
198.8 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
190
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
190
Pipe schematic from manhole 18 0423 to 18 0422
MH: 18 0423MH: 18 0422downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 04230 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - POSSIBLE CONN. @ MH - 3 O'CLK.3.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.8 ft. MGO - General Observation - MAG COAT195.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish195.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish198.8 ft. AMH - Downstream Manhole, Survey Ends - 18 0422

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    3.8 ft. - General Observation - MAG COAT

Observations (11)

DistanceCodeObservation
3.8SAP
3.8SSS
0AMH18 0423
3.8MGOMAG COAT
195.4SSS
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0MWM
0MWL
195.4SAP
198.8AMH18 0422
0MGOPOSSIBLE CONN. @ MH - 3 O'CLK.

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING, HIGH FLOW
custom_field_two
3
customer
1
datetime
2021-03-15T21:58:55-07:00
documentation
PRO PIPE
is_lateral_inspection
false