Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 9, 2021, 07:30 AM
  • 18 0046_18 0045_04092021_012032.mp4

Date
04/09/2021
W/O
885861
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00689
PipeID
P13861
Time
12:30 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8725
Sewer Name
18 MILLS AVENUE TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_885861_TV18176_APR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0045
Downstream MH
18 0046
Dir. of Survey
Upstream
Length Surveyed
298.1 ft.
Total Length
298.1 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
295
O&M Index
2
O&M Quick
2K00
O&M Rating
118
Overall Index
2
Overall Quick
Overall Rating
413
Pipe schematic from manhole 18 0045 to 18 0046
MH: 18 0045MH: 18 0046upstream0 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/CAPPED0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Ends - 18 00462.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish43.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"98.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"104.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"161.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"167.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"216.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"219.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"264.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"270.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"296 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start296.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start296.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start298.1 ft. MWM - Water Mark, 20 %of cross sectional area298.1 ft. MWL - Water Level, 15 %of cross sectional area298.1 ft. AMH - Downstream Manhole, Survey Begins - 18 0045

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
298.1SAV
0MWM
33.3TFC
298.1MGOCONN @ MH 9 O'CLOCK/CAPPED
0MWL
298.1MGOROACHES @ MH
0AMH18 0045
2.1SAV
193.4TFC
298.1AMH18 0046
296DAGS
296SSS
27.2TFC
81.8TFC
2SSS
254.2TFC
130.2TFC
136.4TFC
2DAGS
199.5TFC
78.8TFC

Properties (7)

additional_info
630074040821201
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2021-04-09T00:30:34-07:00
documentation
PROPIPE
is_lateral_inspection
false