Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 9, 2021, 07:12 AM
  • 18 0044A_18 0044_04092021_002342.mp4

Date
04/09/2021
W/O
885861
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00689
PipeID
P13860
Time
12:12 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8725
Sewer Name
18 MILLS AVENUE TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_885861_TV18176_APR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0044
Downstream MH
18 0044A
Dir. of Survey
Upstream
Length Surveyed
280.3 ft.
Total Length
280.3 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
278
O&M Index
2
O&M Quick
2J00
O&M Rating
110
Overall Index
2
Overall Quick
Overall Rating
388
Pipe schematic from manhole 18 0044 to 18 0044A
MH: 18 0044MH: 18 0044Aupstream0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Ends - 18 0044A0 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.2 ft. MGO - General Observation - ROACHES @ MH2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish4.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"10.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"71.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"77.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"125.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"131.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"176.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"180.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"231.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"237.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"277.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start278.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start278.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start280.3 ft. MWL - Water Level, 15 %of cross sectional area280.3 ft. MGO - General Observation - ROACHES @ MH280.3 ft. AMH - Downstream Manhole, Survey Begins - 18 0044280.3 ft. MWM - Water Mark, 20 %of cross sectional area

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
278SSS
269.6TFC
2DAGS
0MWL
278DAGS
154.6TFC
100.2TFC
2.7SAV
43.1TFC
203.1TFC
2SSS
0MGOROACHES @ MH
280.3MGOCONN @ MH 3 O'CLOCK/ACTIVE
275.7TFC
103.6TFC
280.1MGOROACHES @ MH
280.3AMH18 0044A
49.1TFC
0AMH18 0044
0MWM
148.6TFC
209.2TFC
280.3SAV

Properties (7)

additional_info
630074040821201
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2021-04-09T00:12:16-07:00
documentation
PROPIPE
is_lateral_inspection
false