Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 2, 2021, 06:57 AM
  • 01 0448_01 0447_03022021_001953.mp4

Date
03/01/2021
W/O
880631
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00208
PipeID
P00930
Time
10:57 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8587
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
FLORENCE
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
WO_880631_TV01030_MAR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
18 in.
Upstream MH
01 0448
Downstream MH
01 0447
Dir. of Survey
Downstream
Length Surveyed
261.2 ft.
Total Length
261.2 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
260
O&M Index
2
O&M Quick
312I
O&M Rating
107
Overall Index
2
Overall Quick
Overall Rating
367
Pipe schematic from manhole 01 0448 to 01 0447
MH: 01 0448MH: 01 0447downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 01 04482 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7.5 ft. MGO - General Observation - 70% MAG COAT11.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"19 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"39.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN44.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN69.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"87.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"93 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"97.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN121 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"136.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN143.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"154.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 4" - OPEN165.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"187.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN195.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"213.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"219 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"234.4 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"238.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN244.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN261.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish261.2 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS261.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish261.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"261.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish261.2 ft. MSA - Survey Abandoned - DUE TO DEBRIS

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - 70% MAG COAT

    7.5 ft. - General Observation - 70% MAG COAT

Observations (34)

DistanceCodeObservation
97.3TFOPEN
11.2TFC
261.2SAP
0MWL
143.6TFC
0MWM
19TFC
7.5MGO70% MAG COAT
195.2TFC
261.2DSZDEBRIS
261.2DAGS
93TFC
234.4TBA
2SSS
165.1TFC
69.3TFC
154.6TFOPEN
39.5TFOPEN
213.8TFC
187.8TFOPEN
261.2TFA
0MGOROACHES @ MH
44.1TFOPEN
261.2SSS
261.2MSADUE TO DEBRIS
238.9TFOPEN
219TFC
2SAP
244.5TFOPEN
0AMH01 0448
2DAGS
87.5TFC
136.2TFOPEN
121TFA

Properties (7)

additional_info
630069030121202
custom_field_three
ABANDONED DUE TO DEBRIS
custom_field_two
5
customer
1
datetime
2021-03-01T22:57:45-08:00
documentation
PRO PIPE
is_lateral_inspection
false