Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 15, 2021, 08:12 AM
  • 01 0421_01 0420_03152021_012851.mp4

Date
03/15/2021
W/O
880631
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00208
PipeID
P00903
Time
1:12 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8599
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
WO_880631_TV01030_MAR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 0421
Downstream MH
01 0420
Dir. of Survey
Downstream
Length Surveyed
361.6 ft.
Total Length
361.6 ft.
Structural Index
2
Structural Quick
3228
Structural Rating
22
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
26
Pipe schematic from manhole 01 0421 to 01 0420
MH: 01 0421MH: 01 0420downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 04210 ft. MGO - General Observation - CONN AT MH 3 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"46.5 ft. MGO - General Observation - 65% MAG COAT50.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"73.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"78.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"103.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"126.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"131.3 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"151 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"171.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"176.2 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"192 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"219.5 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"227.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"250.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"254.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6" - OPEN275.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"288 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"303.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"328.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"351.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"356.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"359.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish359.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish359.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish361.6 ft. MGO - General Observation - CONN AT MH 3 O'CLOCK/361.6 ft. AMH - Downstream Manhole, Survey Ends - 01 0420

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 65% MAG COAT

    46.5 ft. - General Observation - 65% MAG COAT

Observations (34)

DistanceCodeObservation
359.6SSS
361.6MGOCONN AT MH 3 O'CLOCK/
227.6TFC
2DAGS
359.6DAGS
103.3TFC
27.9TFC
151TFC
46.5MGO65% MAG COAT
275.4TFC
0AMH01 0421
328.4TFC
192TFC
0MGOCONN AT MH 3 O'CLOCK/ACTIVE
2SSS
361.6AMH01 0420
131.3TFA
50.7TFC
171.2TFC
126.2TFC
356.2TFC
78.1TFC
288TFC
351.2TFC
0MWM
250.2TFC
0MWL
2SAP
254.8TFOPEN
303.2TFC
219.5TFA
176.2TFA
73.1TFC
359.6SAP

Properties (7)

additional_info
630069031521001
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-03-15T01:12:38-07:00
documentation
PRO PIPE
is_lateral_inspection
false