Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 12, 2021, 10:24 AM
  • 22 0464_22 0463_02122021_023749.mp4

Date
02/12/2021
W/O
875114
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00816
PipeID
P16802
Time
2:24 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8603
Sewer Name
22 LARK ELLEN TRUNK, SECTS 4,5,&6
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_875114_TV22049_FEB2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0464
Downstream MH
22 0463
Dir. of Survey
Downstream
Length Surveyed
254.2 ft.
Total Length
254.2 ft.
Structural Index
2
Structural Quick
3I2I
Structural Rating
244
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
244
Pipe schematic from manhole 22 0464 to 22 0463
MH: 22 0464MH: 22 0463downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 04640 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2.7 ft. MGO - General Observation - MAG COAT2.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start113.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"185.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"251.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish251.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish254.2 ft. AMH - Downstream Manhole, Survey Ends - 22 0463254.2 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK

Observation photos (3)

  • General Observation - MAG COAT

    2.7 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    12.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
113.3TF
254.2AMH22 0463
0AMH22 0464
0MGOCONNECTION AT MH, 3 O'CLOCK
2.7MGOMAG COAT
185.6TF
2.7SSS
12.6SAP
0MWL
251.2SAP
251.2SSS
254.2MGOCONNECTION AT MH, 3 O'CLOCK
0MWM

Properties (6)

custom_field_three
SPALLING, MAG COAT AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-02-12T02:24:36-08:00
documentation
PRO PIPE
is_lateral_inspection
false