Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 11, 2021, 10:35 AM
  • 32 1030_32 1029_03112021_034724.mp4

Date
03/11/2021
W/O
880299
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00841
PipeID
P19478
Time
2:35 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8598
Sewer Name
32 SOLEDAD CANYON TRUNK, SECTS 1,2,3,&4
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_880299_TV32049_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
32 1030
Downstream MH
32 1029
Dir. of Survey
Downstream
Length Surveyed
349.6 ft.
Total Length
349.6 ft.
Structural Index
4
Structural Quick
4L31
Structural Rating
255
O&M Index
2
O&M Quick
2Z00
O&M Rating
266
Overall Index
3
Overall Quick
Overall Rating
521
Pipe schematic from manhole 32 1030 to 32 1029
MH: 32 1030MH: 32 1029downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 10300 ft. MGO - General Observation - RUN LIST STATES NRCP.0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start26 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start27.9 ft. FS - Fracture Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES32 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start347.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish347.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish347.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish349.6 ft. AMH - Downstream Manhole, Survey Ends - 32 1029

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start

    26 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES

    27.9 ft. - Fracture Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    32 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
32FM
0MWM
0AMH32 1030
0MGORUN LIST STATES NRCP.
349.6AMH32 1029
347.9DAGS
27.9FS
0MWL
26DAE
2DAGS
347.9DAE
347.9FM

Properties (7)

additional_info
630069031021202
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2021-03-11T02:35:45-08:00
documentation
PRO PIPE
is_lateral_inspection
false