Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 11, 2021, 08:36 AM
  • 32 1005_32 1190_03112021_014224.mp4

Date
03/11/2021
W/O
880299
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00841
PipeID
P19452
Time
12:36 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8598
Sewer Name
32 SOLEDAD CANYON TRUNK, SECTS 1,2,3,&4
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_880299_TV32049_MAR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1005
Downstream MH
32 1190
Dir. of Survey
Downstream
Length Surveyed
88.2 ft.
Total Length
88.2 ft.
Structural Index
3
Structural Quick
3B2B
Structural Rating
81
O&M Index
2
O&M Quick
412B
O&M Rating
38
Overall Index
2
Overall Quick
Overall Rating
119
Pipe schematic from manhole 32 1005 to 32 1190
MH: 32 1005MH: 32 1190downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 10052 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start8.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start64.5 ft. MWM - Water Mark, 50 %of cross sectional area64.5 ft. MWL - Water Level, 25 %of cross sectional area85.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish85.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish85.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish88.2 ft. AMH - Downstream Manhole, Survey Ends - 32 119088.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Water Mark, 50 %of cross sectional area

    64.5 ft. - Water Mark, 50 %of cross sectional area

Observations (13)

DistanceCodeObservation
64.5MWM
0MWL
8.3SSS
64.5MWL
88.2AMH32 1190
85.8SAP
0MWM
2SAP
88.2MGOCONNECTION AT MH 9 O'CLOCK
85.8SSS
85.8DAGS
0AMH32 1005
2DAGS

Properties (7)

additional_info
630069031021202
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-03-11T00:36:09-08:00
documentation
PRO PIPE
is_lateral_inspection
false