Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 11, 2021, 08:43 AM
  • 32 1190_32 1004_03112021_015409.mp4

Date
03/11/2021
W/O
880299
Weather
Light Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00841
PipeID
P19451
Time
12:43 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8598
Sewer Name
32 SOLEDAD CANYON TRUNK, SECTS 1,2,3,&4
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_880299_TV32049_MAR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1190
Downstream MH
32 1004
Dir. of Survey
Downstream
Length Surveyed
247.8 ft.
Total Length
247.8 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
245
O&M Index
2
O&M Quick
412I
O&M Rating
102
Overall Index
2
Overall Quick
Overall Rating
347
Pipe schematic from manhole 32 1190 to 32 1004
MH: 32 1190MH: 32 1004downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 11900 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start108.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"245.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish245.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish245.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish247.8 ft. AMH - Downstream Manhole, Survey Ends - 32 1004

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
2SSS
2SAP
0MWL
0AMH32 1190
247.8AMH32 1004
108.3TFA
0MWM
245.9SAP
245.9SSS
0MGOCONNECTION AT MH 9 O'CLOCK
2DAGS
245.9DAGS

Properties (7)

additional_info
630069031021202
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-03-11T00:43:34-08:00
documentation
PRO PIPE
is_lateral_inspection
false