Wastewater/Activity/PacpInspection/1.0Mar 11, 2021, 09:27 AM
  • 32 1002A_32 1286_03112021_023630.mp4

Date
03/11/2021
W/O
880299
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00841
PipeID
P19448
Time
1:27 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8598
Sewer Name
32 SOLEDAD CANYON TRUNK, SECTS 1,2,3,&4
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_880299_TV32049_MAR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1002A
Downstream MH
32 1286
Dir. of Survey
Downstream
Length Surveyed
224.4 ft.
Total Length
224.4 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
220
O&M Index
2
O&M Quick
412H
O&M Rating
92
Overall Index
2
Overall Quick
Overall Rating
312
Pipe schematic from manhole 32 1002A to 32 1286
MH: 32 1002AMH: 32 1286downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 1002A0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start223.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish223.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish223.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish224.4 ft. AMH - Downstream Manhole, Survey Ends - 32 1286224.4 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
2SSS
0MWL
2SAP
2DAGS
224.4AMH32 1286
0AMH32 1002A
0MGOCONNECTION AT MH 3 O'CLOCK
224.4MGOCONNECTION AT MH 9 O'CLOCK
223.1SSS
223.1SAP
223.1DAGS
0MWM

Properties (7)

additional_info
630069031021202
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-03-11T01:27:53-08:00
documentation
PRO PIPE
is_lateral_inspection
false