B 0204_B 0203_03242021_013334.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - General Observation - MAG COAT
223.9 ft. - Tap Break-In Capped, at 01 o'clock, -, within 8 inches of joint: NO, 8"
320.8 ft. - Tap Break-In Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"
328 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 12"
420.6 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 8"
458.4 ft. - Tap Break-In Capped, at 01 o'clock, -, within 8 inches of joint: NO, 8"
| Distance | Code | Observation |
|---|---|---|
| 723.7 | SSS | — |
| 223.9 | TBC | — |
| 458.4 | TBC | — |
| 0 | MWM | — |
| 2 | SSS | — |
| 2 | SAP | — |
| 0 | AMH | B 0204 |
| 723.7 | SAP | — |
| 2 | MGO | MAG COAT |
| 320.8 | TBC | — |
| 420.6 | TB | — |
| 0 | MWL | — |
| 328 | TBA | — |
| 723.7 | AMH | B 0203 |